BMW OF EUGENE

CD Redding partnered with Swickard Auto Group to complete a brand/image upgrade and remodel at the BMW dealership in Eugene, Oregon.  CD Redding’s preconstruction planning and continuous communication allowed the dealership’s sales and service areas to remain open throughout construction with minimal disruption. Exterior upgrades included a new exterior facade, brand signage, EV charging stations,…

WITHNELL FAMILY YMCA

Faced with increased costs of operating and maintaining a 92-year-old building, the Salem Family YMCA partnered with CD Redding to build a new 3-story, state-of-the-art community center on their existing downtown site across from the Oregon Capital Mall. This project began with the demolition of existing structures along with the environmental mitigation of on-site tanks…

HL Stearns

With a major focus on lighting and controls, HL Stearns hired CD Redding to perform an extensive remodel on a building dating back to the 1960s.  As the new corporate office for this lighting distributor, CDR worked with ownership to deliver not only beautiful modern office space for HLS employees but also an office-wide showroom…

Salem Outpatient Surgery Center

At the aging Northbank Medical building, the owner and architect turned to “adaptive reuse” to breathe new life into an old facility. Situated on a tight and challenging site, the result was a cutting-edge ambulatory surgical center (ASC). This was the pilot project to be the first ASC evaluated under new code requirements administered by…

UNION GOSPEL MISSION MEN’S SHELTER

CD Redding was involved in this project 8 years prior to breaking ground, which allowed our team to implement cost saving measures both in the pre-construction and during construction of the building. As a non-profit, it was important to work with UGM during the budgeting process to allow them to adequately fundraise.  The Union Gospel…

BETHEL CHURCH

Another seamless partnership between Building God’s Way (BGW) and CD Redding Construction designed and built this state of the art church facility with fully automated lighting controls and HVAC systems. At the core of the building is a 6,903 sq. ft. multi-purpose room which transitions from a santuary to a full sized basketball court or…

FRERES LUMBER CO.’S MPP PLANT

This project was a new plant for Freres Lumber Co. The buiding alone is approximately 4 acres. Designed for manufacturing Freres Lumber Co.’s Mass Panel Plywood (MPP) product. The building has 45’ eave height and 7 bridge cranes. Approximately 70,000 sq ft has hydronic (in slab) heat. The building uses polygal wall lites for natural…

ST. INNOCENT WINERY

This project for St. Innocent Winery was a full production facility along with a commercial kitchen and tasting room. Off the tasting room is a large concrete patio overlooking the vineyard.  The wine production area was designed to optimize each step of the winemaking process. The fermented wines rest in a naturally humidified and cooled…